<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-26T04:14:24Z</responseDate><request verb="GetRecord" identifier="oai:dspace.unza.zm:123456789/8528" metadataPrefix="dim">https://dspace.unza.zm/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.unza.zm:123456789/8528</identifier><datestamp>2024-04-09T03:00:33Z</datestamp><setSpec>com_123456789_18</setSpec><setSpec>col_123456789_91</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author">Ng’andu, Vennah Beene</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2024-04-08T12:07:14Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2024-04-08T12:07:14Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2020</dim:field>
   <dim:field mdschema="dc" element="description">Thesis of Engineering in Project Managemen</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract">The risks associated with construction can be transferred to insurance. However, the levels  of knowledge and use of insurance covers in the Zambian construction industry (ZCI) are  not known. Knowledge and use of insurance covers have not been previously described.  The study was designed to cover this knowledge gap among employees in both  government and private sector construction institutions; insurance and financial  institutions. A cross-sectional evaluation of 68 participants from government and private construction industry organisations was conducted between July and October 2019 in  Lusaka using a questionnaire and focused in-depth interviews who were purposively  sampled. The frequencies of responses among government employees were compared 
with those of private organizations using Chi-square and Fischer’s exact tests where  appropriate. The participants consisted largely of the private sector (67%). Private sector  personnel were more likely to have had five or more years of work experience than those  of the Government of the Republic of Zambia (GRZ) institutions (86% vs 36%, p=.001).  The majority (at least 88%) of the participants knew securities and contractors’ all-risk  insurance, and there was no difference between GRZ and the private sector. Personnel  from GRZ institutions were more likely to have used CAR-insurance security in one or  more projects than those from the private sector (100% vs 47%, p=.009). Most of the  participants knew securities and contractors’ all-risk insurance, but there was variation in 
their use. Majority of the participants had valid securities and successful implementation  of securities. There were variable levels of compliance among different stakeholders  towards securities. About half of the participants had systems for monitoring performance  of securities; the majority of the systems were said to be effective.</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://dspace.unza.zm/handle/123456789/8528</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en</dim:field>
   <dim:field mdschema="dc" element="publisher">The University of Zambia</dim:field>
   <dim:field mdschema="dc" element="title">Compliance with securities and contractors’all risk insurance regulations among key Zambian construction industry stakeholders in Lusaka.</dim:field>
   <dim:field mdschema="dc" element="type">Thesis</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>