The telemetry network design and the implementation(case study Zesco network)

dc.contributor.authorMulenga, Bwalya
dc.contributor.authorGeoffrey
dc.date.accessioned2015-09-07T15:16:06Z
dc.date.available2015-09-07T15:16:06Z
dc.date.issued2015-09-07
dc.descriptionElectrical and Electronic Engineering Students Report-2003en_US
dc.description.abstractAs with any business organization in a competitive market, the financial viability depends on the ability to maximize its returns at minimum costs. The problem of minimizing the total costs on transmission lines wayleave maintenance or bush clearing is one of minimizing the costs on labour, materials, transport and overheads (logistics). Fires in the vicinity of power lines cause faults. When enough carbon and moisture emanates from a fire, phase to ground (flashover or discharge) and phase to phase faults occur on power transmission lines .The trade offs between maintenance costs and risks of power line faults should ultimately result in the reduction of maintenance costs as well as reduce the risk of fires that are able to cause line faults. Mathematical programming methods such as linear programming, network flow and critical path scheduling are suited particularly well for supporting management decision-making processes. Linear programming is one of the most employed management science tools used in solving optimisation problems, such as minimising costs and resource usage. This ensures that the objective, in relation to other imposed limitations, is satisfied. Critical path analysis method could be used to reduce the bush clearing costs through optimal allocation of resources: time, money, materials, human and other resources. In essence a systematic and well-organised bush clearing maintenance should therefore be attained at the lowest possible cost. A power transmission system is judged by its economic success that is by its ability to furnish a reliable supply to consumers at a price lower than that of any alternative scheme.en_US
dc.identifier.urihttp://dspace.unza.zm/handle/123456789/4028
dc.language.isoenen_US
dc.subjectTelemetry network designen_US
dc.subjectAutomatic controlen_US
dc.subjectElectric power distributionen_US
dc.titleThe telemetry network design and the implementation(case study Zesco network)en_US
dc.typeOtheren_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Mulenga---Bwalya0001.PDF
Size:
7.58 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
5.13 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections